Now you can begin creating your schedule. After clicking on the Schedule command in the toolbar you will see two options for electrical schedules.
One option is for electrical items and accessories. Choosing this will only show your equipment with electrical connections, divided by the areas you set.
The other electrical option is for services. This will separate out the utilities with the equipment. You’ll notice that the position number of each utility correlates with the equipment.
For example, in the first line you can see code C.03, which corresponds with the oven in position C03.